The key areas of activity of LLC “NORD-ENGINEERING” in the chemicalization of oil extraction processes include the maintenance of dosing devices and the removal of asphalt-resin and paraffin deposits from pump-compressor pipes and the near-wellbore zone of the reservoir.

The key areas of activity of LLC “NORD-ENGINEERING” in the chemicalization of oil extraction processes include the maintenance of dosing devices and the removal of asphalt-resin and paraffin deposits from pump-compressor pipes and the near-wellbore zone of the reservoir.

Key Figures of the Direction

Staff

50+

PEOPLE

Number of Specialized Equipment

22+

UNITS

Serviced Units

1,000

UNITS

Comprehensive Maintenance of Dosing Units

  • Pressure testing of process piping and tanks before commissioning;
  • Ongoing monitoring and compliance with the set operating mode of dosing pumps;
  • Pump inspection (eliminating inhibitor leaks); Delivery and refilling of inhibitors;
  • Repair of dosing units, pumps, and tanks;
  • Installation and dismantling;
  • Disposal of inhibitor residues;
  • Injection of inhibitor into the reservoir;
  • Periodic dosing of inhibitor into the well annulus;
  • Removal of salt deposits from downhole equipment using acid compositions.

Removal of asphalt-resin and paraffin deposits

The precipitation of asphalt-resin and paraffin deposits (ARPD) is a major cause of reduced filtration characteristics in the near-wellbore zone of production wells. Additionally, ARPD is often responsible for the failure of oilfield equipment and decreased pipeline transportation efficiency. LLC “NORD-ENGINEERING” utilizes modern inhibitors and solvents to remove ARPD and hydrate formations from oil production wells, surface communications, field equipment, and pipelines.