ООО «НОРД-ИНЖИНИРИНГ»

Well Preparation Cycle for Repair and Killing

Person responsible for the direction

Morozov
Sergey Andreevich

Head of the Workshop for the Preparation of Technological Fluids for Well Killing

+7 (3466) 67-45-67
morozov_sa@nord-engineering.ru

Currently, most major domestic oil and gas fields are in the late stage of development, making well repair and killing services particularly in demand. LLC “NORD-ENGINEERING” provides a full cycle of well preparation for repair and killing.

Currently, most major domestic oil and gas fields are in the late stage of development, making well repair and killing services particularly in demand. LLC “NORD-ENGINEERING” provides a full cycle of well preparation for repair and killing.

Key Figures of the Direction

Staff

25+

PEOPLE

Рабочих звеньев

10+

Work Units

Операций в месяц

50+

Operations per Month

Well Killing

Well killing is one of the most common operations in the maintenance of oil and gas wells. Typically, each well undergoes killing at least once a year due to the need for underground repairs, pump equipment replacement, wellbore cleaning from contaminants, and other maintenance procedures.

Gentle Well Killing

To preserve reservoir oil recovery, LLC “NORD-ENGINEERING” employs a gentle well killing technology using a gel-suspension composition (GSC).

Gentle well killing:
  • Reduces well repair time
  • Lowers killing fluid consumption
  • Shortens well recovery time after maintenance
  • Decreases work costs during TKRS
  • Preserves maximum productivity

Injection of Blocking Compositions

The blocking composition acts as a buffer, sealing perforation intervals and preventing the main killing fluid from penetrating the reservoir. This helps maintain the reservoir’s collector properties.

Photo